Bovone straight line edging machines Bovone ELB 10 45

Bovone straight line edging machines Bovone ELB 10 45

Set of wheels for Bovone ELB 10 45 straight line edging machine.  Machine with ten wheels with edge final polishing with felt and cerium oxide. 

Free change (wheel and transport cost) in case of technical or dimensions problem for one wheel for this straight line edging machine from Bovone

Standards

Position Reference Machine Times Price
Position1 ELB1045.P1 80 Mesh meules Bovone Straightline edging machine Bovone ELB 10 45 14 or 16 working days 150,00 €
Position 2 ELB1045P2 120 Mesh Bovone meules Straightline edging machine Bovone ELB 10 45 14 or 16 working days 150,00 €
Position 3 ELB1045 Bovone P3 Straightline edging machine Bovone ELB 10 45 14 or 16 working days 87,50 €
Position 4 ELB1045 Bovone meules Straightline edging machine Bovone ELB 10 45 14 or 16 working days 87,50 €
Position 5 Bovone 1045 P5 meule joint verre Straightline edging machine Bovone ELB 10 45 14 or 16 working days 87,50 €
Position 6 Bovone feutre 1045 170 It Straightline edging machine Bovone ELB 10 45 14 or 16 working days 32,50 €
Position 7 Bovone 1045 P7 arête verre Straightline edging machine Bovone ELB 10 45 18 or 20 days 131,25 €
Position 8 Bovone 1045 P8 arête verre meule Straightline edging machine Bovone ELB 10 45 14 or 16 working days 37,50 €
Position 9 Bovone 1045 P8 arête verre meule Straightline edging machine Bovone ELB 10 45 18 or 20 days 131,25 €
Position 10 Bovone 1045 P8 arête verre meule Straightline edging machine Bovone ELB 10 45 14 or 16 working days 37,50 €
Cup diamond wheel for edge :: ELB1045.P1 80 Mesh meules Bovone Position1 -- 14 or 16 working days
Cup diamond wheel for edge :: ELB1045P2 120 Mesh Bovone meules Position 2 -- 14 or 16 working days
Diamond resin cup wheel :: ELB1045 Bovone P3 Position 3 -- 14 or 16 working days
Resin diamond cup wheel :: ELB1045 Bovone meules Position 4 -- 14 or 16 working days
Diamond resinl cup wheel :: Bovone 1045 P5 meule joint verre Position 5 -- 14 or 16 working days
Felt for edging machine :: Bovone feutre 1045 170 It Position 6 -- 14 or 16 working days
Diamond cup wheel for arris :: Bovone 1045 P7 arête verre Position 7 -- 18 or 20 days
Polishing arris cup wheel :: Bovone 1045 P8 arête verre meule Position 8 -- 14 or 16 working days
Diamond cup wheel for arris :: Bovone 1045 P8 arête verre meule Position 9 -- 18 or 20 days
Polishing arris cup wheel :: Bovone 1045 P8 arête verre meule Position 10 -- 14 or 16 working days

Accessories

Position Reference Machine Times Price
Dressing tools Carborundum 15x1x1 Bavelloni All machines with metallic bond wheels 14 or 16 working days 6,00 €
Dressing tools Punice 9x6x6 Machines with bakelite wheels 14 or 16 working days 3,50 €
Dressing tools dressing stone 20x80x200 mm Glass drilling machines Available 9,90 €
Cerium oxide Axion 20 Kg Glass bevelling and edging machines 10 or 12 days on average 409,00 €
Flat glass processing oil Huile façonnage, cooling oil All machines for flat glass processing 18 or 20 days 180,00 €
Dressing tools :: Carborundum 15x1x1 Bavelloni Dressing tools -- 14 or 16 working days
Dressing stone :: Punice 9x6x6 Dressing tools -- 14 or 16 working days
Dressing stone for drills :: dressing stone 20x80x200 mm Dressing tools -- Available
Cerium oxide :: Axion 20 Kg Cerium oxide -- 10 or 12 days on average
Cooling oill glass processing.... :: Huile façonnage, cooling oil Flat glass processing oil -- 18 or 20 days

Technical file

Position Reference Machine Times Price
Fiche technique gratuite à télécharger Toutes les rectilignes Disponible 0,00 €
Technical file. Straight line... :: Fiche technique gratuite à télécharger -- Disponible